
The NS Timetable 2023
It introduces useful contacts (chapter 1), describes the infrastructure (chapter 2), details access conditions (chapter 3), explains the process of capacity allocation (chapter 4), presents the charging rules (chapter 5), the rules on operation (chapter 6) and those relative to service facilities (chapter 7).
It contains all the practical, technical, administrative and charging rules for operating on the network.
Main document and appendices
appendix 1 - Document management
appendix 1.0 - List of NS Appendices and date of last update
Published on 02/09/2022 updated on 02/09/2022
appendix 1.1 - Version control from 10 September 2021
Published on 02/09/2022 updated on 02/09/2022
appendix 1.2 - List of technical documents cited in the Network Statement
Published on 02/09/2022 updated on 02/09/2022
appendix 2 - Infrastructure
appendix 2.1 - List of border sections and interface zones
Published on 02/09/2022 updated on 02/09/2022
appendix 2.2 -Location of private sidings
Published on 02/09/2022 updated on 02/09/2022
appendix 3 - Contracts
appendix 3.1 -General conditions applicable to contracts for use of the national rail network infrastructure and the contract for allocation of train paths on the national rail network
Published on 02/09/2022 updated on 02/09/2022
appendix 3.2.1 -Specimen of the special conditions of the contract for use of the national rail network infrastructure
Published on 02/09/2022 updated on 02/09/2022
appendix 3.2.2 -Specimen of the special conditions of the contract for train path allocation on the national rail network
Published on 02/09/2022 updated on 02/09/2022
appendix 3.2.3 -Special conditions for use of the CANIF badge and autorisation
Published on 02/09/2022 updated on 02/09/2022
appendix 3.2.4 -Special conditions for subscription to the GSM-R Priority 4 Service
Published on 02/09/2022 updated on 02/09/2022
appendix 3.3 -General outline of a framework agreement
Published on 02/09/2022 updated on 02/09/2022
appendix 3.3.1 -Outline of a framework agreement for freight
Published on 02/09/2022 updated on 02/09/2022
appendix 3.4.1 -General conditions of the contract for use of SNCF Réseau information systems
Published on 02/09/2022 updated on 02/09/2022
appendix 3.4.2 -Specimen of the special conditions of the contract for use of the SNCF Réseau information systems
Published on 02/09/2022 updated on 02/09/2022
appendix 3.5 -Complaints (single file)
Published on 02/09/2022 updated on 02/09/2022
Appendix 3.6 - Agreement on the opening of additional lines, stations and signal boxes
Published on 02/07/2023 updated on 02/07/2023
appendix 4 - Capacity and works
appendix 4 -Technical reference documents for train path construction
Published on 02/09/2022 updated on 02/09/2022
appendix 5 - Charging
appendix 5.1.1 -Charging principles for minimum services
Published on 02/09/2022 updated on 02/09/2022
appendix 5.1.2 -Charging principles for charges related to the use of electric traction
Published on 02/09/2022 updated on 02/09/2022
Appendix 5.1.3 - Charging principles differentiated charging
Published on 02/07/2023 updated on 02/07/2023
appendix 5.2 -Scale of charges for minimum services: charges for passenger activities under contract (5.2.1), passenger activities not under contract (5.2.2) freight activity (5.2.3), and special charges (5.2.4)
Published on 02/09/2022 updated on 02/09/2022
appendix 5.3 - Scale of charges for IS services
Published on 02/09/2022 updated on 02/09/2022
appendix 5.4 - Scale of charges for additional, ancillary or other services
Published on 02/09/2022 updated on 02/09/2022
appendix 5.5 - List of the basic sections on the national rail network
Published on 02/09/2022 updated on 02/09/2022
appendix 5.6 - List of national railway lines together with their UIC group
Published on 02/09/2022 updated on 02/09/2022
appendix 5.7 - Tonnages of passenger rolling stock taken into account for the drawing up of invoices for minimum services
Published on 02/09/2022 updated on 02/09/2022
appendix 5.8 - Rules for the management of the reciprocal incentive system
Published on 02/09/2022 updated on 02/09/2022
appendix 7 - Service facilities
appendix 7.1 -Contractual conditions common to all contracts for the use of IS
Published on 02/09/2022 updated on 02/09/2022
appendix 7.2 - National agreement for the use of SNCF Réseau sidings dependent on the public domain due to common use
Published on 02/09/2022 updated on 02/09/2022
appendix 7.3 -Use of freight yards (portfolio and contractual outline)
Published on 02/09/2022 updated on 02/09/2022
appendix 7.4 -Use of combined transport terminals (portfolio and contractual outline)
Published on 02/09/2022 updated on 02/09/2022
appendix 7.5 -General conditions applicable to contracts for the provision of industrial spaces located in service facilities dependent on the SNCF railway public domain
Published on 02/09/2022 updated on 02/09/2022
appendix 7.6 - List of immediately accessible freight yards (7.6.1) and those accessible after diagnostics and any necessary repair work (7.6.2) and list of the combined transport terminals (7.6.3)
Published on 02/09/2022 updated on 02/09/2022
appendix 7.7 - Sites unused for more than 2 years
Published on 02/09/2022 updated on 02/09/2022
appendix 7.8 - Guidelines for the pricing of service facilities
Published on 02/09/2022 updated on 02/09/2022
appendix 7.9 - Scale of charges for basic services provided on the service facilities
Published on 02/09/2022 updated on 02/09/2022
appendix 7.11 - Portfolios of other service facility managers
Published on 02/09/2022 updated on 02/09/2022
Appendix 8 - Reference Document for the Tours–Bordeaux Line (DRL) managed by LISEA
Appendix 8 - Reference Document for the Tours–Bordeaux Line (DRL)
Published on 02/07/2023 updated on 02/07/2023